Fort Bend County, Fireworks, and Drought

28 12 2012

Just in time for New Year’s Eve, the Texas Forest Service has determined that drought conditions no longer exist in Fort Bend County.  The KBDI Index must be an average of 575 for drough conditions to exist within a TexasFireworks county for the purpose of restricting certain aerial fireworks.  Though the County’s index was nearing 500 just a few weeks ago, it is now at 419.  So aerial fireworks will now be allowed to be used in the unincorporated areas of the County on New Year’s Eve; but remember, most cities have bans on the use of fireworks.  Please check with your local jurisdiction to make sure what the regulations are for use of fireworks.

However, many places in Texas are still facing drought conditions.  Public water systems across the State, and in our area, are taking actions to conserve water usage.  There is a possibility that dry conditions may continue across the State for the next several months.  As a matter of fact, the Gulf Coast Water Authority is attempting to limit the use of water by ten percent.  The Gulf Coast Water Authority provides water to some areas in Fort Bend County.  For more information, the City of Missouri City has issued a Media News Release on the subject (published on December 28, 2012).  The content of the News Release is below:

Missouri City Drought Contingency Implementation

Texas is experiencing widespread drought conditions. Forecasts for early 2013 include below normal rainfall and above normal temperatures. The Texas Commission on Environmental Quality has issued an Order requiring the implementation of certain water use restrictions, and, as a result, the Gulf Coast Water Authority has set a goal of 10 percent reduction in water use. As a result, effective December 28, 2012, the City of Missouri City has implemented the Stage 2 Response of its Drought Contingency Plan for its Surface Water Treatment Plant Utility Service Area.  This is the area served by Sienna Plantation Municipal Utility Districts. 

The current (time period) water supply reductions and corresponding demand restrictions are temporary in nature; however, the current end date is unknown. 

The City in conjunction with the Gulf Coast Water authority will be monitoring usage and sharing information, and the City will be supplying notice and reports relating to the drought contingency plan to local and state authorities.  

At this time, for residents of Sienna Plantation utility districts, please implement the water conservation measures specified by your utility provider.  Typical water use restrictions include limitations on outdoor watering and at home washing of vehicles.

For more information, please contact your utility provider at the number on your water bill or you may contact the City for additional information at 281-403-8500.

Advertisements




Senate Passes Bill Allowing Fort Bend County Representation on the Gulf Coast Water Authority Board

6 04 2011

Zen Zheng, Houston Chronicle, wrote the following article.  The item was published on April 4, 2011, and provides an update on the status of Senate Bill 683, which affects Fort Bend County.

The Texas Senate has unanimously passed a bill to allow Fort Bend and Brazoria counties to have voting power for the first time on the Gulf Coast Water Authority Board.  Senate Bill 683, drafted by Sen. Joan Huffman, R-Lake Jackson, and its companion House Bill 3621, authored by Rep. Dennis Bonnen, R-Angleton, would bring the number of voting members from seven to nine.

Local authorities, including Fort Bend County Commissioners Court and Sugar Land Mayor James Thompson, support the legislation.  Fort Bend County Judge Bob Hebert called the two counties’ ability to add voting members to the board “a simple matter of fairness and equity.”

The water authority board opposes both bills and has hired a lobbyist to block Bonnen’s proposed legislation, which the House is expected to consider soon, Sugar Land city officials said.  The Senate bill, which was passed on a 30-0 vote, would grant the power to two non-voting representatives – one from each of the two counties – who participate in discussions during board meetings with the seven regular voting board members, who are all appointed by Galveston County Commissioners Court.

The new legislation would enable Fort Bend and Brazoria county commissioners to appoint new voting members to the board.  The water authority owns and operates rivers, creeks and man-made channels that provide surface water in Galveston, Fort Bend and Brazoria counties.

Since its creation in 1965, the authority, which serves residents, cities and industries, has grown in both capacity and customer base that reach far beyond Galveston County. Nearly 40 percent of the total contracted water volume is provided to Fort Bend and Brazoria counties.